Winter Special Sale Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 2493360325

Good News !!! PSP Planning & Scheduling Professional (PSP) Exam is now Stable and With Pass Result

PSP Practice Exam Questions and Answers

Planning & Scheduling Professional (PSP) Exam

Last Update 1 day ago
Total Questions : 163

Planning & Scheduling Professional (PSP) Exam is stable now with all latest exam questions are added 1 day ago. Incorporating PSP practice exam questions into your study plan is more than just a preparation strategy.

PSP exam questions often include scenarios and problem-solving exercises that mirror real-world challenges. Working through PSP dumps allows you to practice pacing yourself, ensuring that you can complete all Planning & Scheduling Professional (PSP) Exam practice test within the allotted time frame.

PSP PDF

PSP PDF (Printable)
$50
$124.99

PSP Testing Engine

PSP PDF (Printable)
$58
$144.99

PSP PDF + Testing Engine

PSP PDF (Printable)
$72.8
$181.99
Question # 1

Using the crashed schedule, if you start Activity 2002 on 12 August 2021. what is the finish date for Activity 2002?

Options:

A.  

19 Sep 2021

B.  

08 Sep 2021

C.  

09 Sep 2021

D.  

27 Aug 2021

Discussion 0
Question # 2

Which of the following is NOT required when performing weekly or monthly schedule updates?

Options:

A.  

Percent complete.

B.  

Remaining duration of activities.

C.  

Actual finish of activities.

D.  

Original duration of activities.

Discussion 0
Question # 3

Assuming a total of 30 lifts per crane per day, what is the maximum number of lifts that could be accomplished using 3 small tower cranes over a 5-day period?

Question # 3

Options:

A.  

450 lifts

B.  

300 lifts

C.  

45 lifts

D.  

150 lifts

Discussion 0
Question # 4

Which of the following documents is most likely to be of the LEAST value to a planner/scheduler when planning a contractor's baseline critical path schedule for the construction of a large high-clearance bridge located very near an airport? The contractor has been awarded the contract.

Options:

A.  

The project plans and specifications

B.  

The project geotechnical report

C.  

The regulations published by the government aviation agency

D.  

The government's report on future high-clearance bridge projects

Discussion 0
Question # 5

What method offers the best chance of the schedule being used effectively to implement the project in the field?

Options:

A.  

Issue detailed schedule updates as frequently as possible.

B.  

Obtain consent and agreement to the schedule from the key project personnel.

C.  

Include detailed and stringent set of scheduling specifications in the contract.

D.  

Allow large time contingencies on milestones and completion deadlines.

Discussion 0
Question # 6

Considering the information provided for the project, what is the factor that most influences the successful crashing of the schedule?

Options:

A.  

Avoiding a late delivery penalty from the owner

B.  

Maximizing the $500,000 bonus

C.  

Avoiding the 2023-2024 winter/wet weather season

D.  

Minimizing the indirect expenditure chargeable to the contractor

Discussion 0
Question # 7

During proofing of the product manual, a problem was discovered requiring 15 days additional time to affect a correction. How can the date of availability be maintained?

Options:

A.  

Expedite Draft Product Manual by 5 days

B.  

Delay Release for Manufacture by 5 days

C.  

Delay Manufacture Product by 5 days

D.  

Expedite Package Product by 5 days

Discussion 0
Question # 8

Resource planning must take all of the following into account except for:

Options:

A.  

Types of materials, equipment and labor skills required to complete the project.

B.  

Earned value techniques established for the project.

C.  

Time available to complete the project.

D.  

Cash flow (expenditure) limitations for completing work on the project.

Discussion 0
Question # 9

Project delays are best analyzed

Options:

A.  

After either the contractor or the owner acknowledges ^responsibility for the delay.

B.  

Contemporaneously with the delay.

C.  

By an expert after the project is finished when complete records are available and the impact is known.

D.  

Late in the project.

Discussion 0
Question # 10

The activity with the most total float is:

Question # 10

Options:

A.  

Activity I.

B.  

Activity

C.  

C.  

Activity

F.  

D.  

Activity

D.  

Discussion 0
Get PSP dumps and pass your exam in 24 hours!

Free Exams Sample Questions