Winter Special Sale Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 2493360325

Good News !!! CLSSBB Certified Lean Six Sigma Black Belt (CLSSBB) is now Stable and With Pass Result

CLSSBB Practice Exam Questions and Answers

Certified Lean Six Sigma Black Belt (CLSSBB)

Last Update 5 days ago
Total Questions : 357

Certified Lean Six Sigma Black Belt (CLSSBB) is stable now with all latest exam questions are added 5 days ago. Incorporating CLSSBB practice exam questions into your study plan is more than just a preparation strategy.

CLSSBB exam questions often include scenarios and problem-solving exercises that mirror real-world challenges. Working through CLSSBB dumps allows you to practice pacing yourself, ensuring that you can complete all Certified Lean Six Sigma Black Belt (CLSSBB) practice test within the allotted time frame.

CLSSBB PDF

CLSSBB PDF (Printable)
$50
$124.99

CLSSBB Testing Engine

CLSSBB PDF (Printable)
$58
$144.99

CLSSBB PDF + Testing Engine

CLSSBB PDF (Printable)
$72.8
$181.99
Question # 1

Which of the following is the best technique for improving the precision of a designed experiment when the experimental material is NOT homogeneous?

Options:

A.  

Blocking

B.  

Confounding

C.  

Randomization

D.  

Fractionalizing

Discussion 0
Question # 2

Which of the following measures is used to show the ratio of defects to units?

Options:

A.  

DPU

B.  

DPO

C.  

DPMO

D.  

PPM

Discussion 0
Question # 3

Following have been exponents of Quality evolution except?

Options:

A.  

Juran

B.  

Philip Crossby

C.  

Wockhardt

D.  

Deming

Discussion 0
Question # 4

__________________can be measured against a benchmark in a process.

Options:

A.  

Performance

B.  

Outcome of the process

C.  

Operational Efficiency

D.  

All of the above

Discussion 0
Question # 5

Which of the following tools is used extensively in quality function deployment (QFD)?

Options:

A.  

Affinity diagram

B.  

Matrix diagram

C.  

Cause and effect diagram

D.  

Activity network diagram

Discussion 0
Question # 6

The term used to describe the risk of a Type I error in a test of hypotheses is?

Options:

A.  

power

B.  

confidence level

C.  

level of significance

D.  

beta risk

Discussion 0
Question # 7

Find the value of m or b1:

Options:

A.  

0.25

B.  

0.63

C.  

0.75

D.  

1.22

Discussion 0
Question # 8

Typically, which of the following actions is NOT used to reduce process cycle time?

Options:

A.  

Analyzing current processes

B.  

Reducing queue times

C.  

Setting scheduling priorities

D.  

Implementing activity-based costing

Discussion 0
Question # 9

The purpose of using control charts is to

Options:

A.  

determine if the process is performing within specifications

B.  

evaluate process performance over time

C.  

determine how to recreate the process

D.  

detect the causes of nonconformities

Discussion 0
Question # 10

A meeting is called for all three shifts to determine the settings to be used on machine #45. This is an example of:

Options:

A.  

visual factory

B.  

kanban

C.  

poka-yoke

D.  

standard work

E.  

set up time reduction (SMED)

Discussion 0
Get CLSSBB dumps and pass your exam in 24 hours!

Free Exams Sample Questions