Halloween Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

Good News !!! D-PEXE-IN-A-00 Dell PowerEdge XE9680 and XE8640 Install is now Stable and With Pass Result

D-PEXE-IN-A-00 Practice Exam Questions and Answers

Dell PowerEdge XE9680 and XE8640 Install

Last Update 1 week ago
Total Questions : 14

Dell PowerEdge XE9680 and XE8640 Install is stable now with all latest exam questions are added 1 week ago. Incorporating D-PEXE-IN-A-00 practice exam questions into your study plan is more than just a preparation strategy.

D-PEXE-IN-A-00 exam questions often include scenarios and problem-solving exercises that mirror real-world challenges. Working through D-PEXE-IN-A-00 dumps allows you to practice pacing yourself, ensuring that you can complete all Dell PowerEdge XE9680 and XE8640 Install practice test within the allotted time frame.

D-PEXE-IN-A-00 PDF

D-PEXE-IN-A-00 PDF (Printable)
$42
$119.99

D-PEXE-IN-A-00 Testing Engine

D-PEXE-IN-A-00 PDF (Printable)
$49
$139.99

D-PEXE-IN-A-00 PDF + Testing Engine

D-PEXE-IN-A-00 PDF (Printable)
$61.95
$176.99
Question # 1

A deployment engineer is preparing to install three PowerEdge XE9680 servers in a rack supplied by the customer.

What must they before going on-site to install the servers?

Options:

A.  

The rack can accommodate the length of the servers.

B.  

The customer completed the required training on the server.

C.  

The rack will have a top-of-rack switch.

D.  

The rack has at least six PDUs and two power sources.

Discussion 0
Question # 2

A deployment engineer is connecting the network cables on an XE9680 server. The data center administrator wants to know why the server does not have an OCP card for network connectivity.

How should the engineer respond to the administrator's query?

Options:

A.  

An OCP card is required for the server to achieve POST when powered on.

B.  

The LOM card acts as an OCP card and supports OCP 3.0.

C.  

The OCP card is an optional component.

D.  

The server does not support an OCP card.

Discussion 0
Question # 3

What must be considered regarding stab-in rails with installing a PowerEdge XE server?

Options:

A.  

Enable a vertical installation of the server with the use of J-slots.

B.  

Do not support extending the server from the rack.

C.  

Only used in 4-post, square hole racks.

D.  

Inner rail must be installed on the server before installing in rack.

Discussion 0
Question # 4

A deployment engineer is installing a PowerEdge XE8640 server in a rack with round holes. They cannot get the outer rail portion to fit flush with the rack frame.

What is the reason the outer rail is not flush with the frame?

Options:

A.  

The rail latch is not engaged.

B.  

The PowerEdge XE8640 does not support a round-hole rack.

C.  

A small offset is expected between the rail mounting post and the rack.

D.  

Weight has not been applied to the rail.

Discussion 0
Get D-PEXE-IN-A-00 dumps and pass your exam in 24 hours!

Free Exams Sample Questions